banner main

Project

This was Sewer, Storm, Dig out, & Backfill with Final Grade for an ADU. The Sewer was 12 feet deep and 200+ feet long. While diging out for the foundation we earthed a rock the size of a volkswagon.

Location: Tacoma

Size: na

Build Date: Summer 2013

Designed By: na