Project

The Advanced Build team, under Cory’s direction, put in a full construction entrance with erosion control, culvert, and driveway base to the eventual build site. The large amounts of water run-off from the road on the hill had caused some problems at the entry area which we were able to fix to the advantage of not only the owners but their neighbors as well.

Location: Graham

Size: 200+ feet

Build Date: Spring 2015

Designed By: na